The specialist aviation consultancy, Alan Stratford and Associates (ASA) has been advising the National Grid on the possible aviation-related impacts that might result from a new 140 km overhead power line (OHL) between Grimsby in northeast Lincolnshire and Walpole in north Norfolk. The new power line, which forms part of The Great Grid Update, passes close to several licensed and unlicensed airfields and smaller airstrips handling various light aircraft types, helicopters and gliders.
In conjunction with National Grid’s engineering team and their engineering design consultants, LSTC Group, ASA has been liaising with the airfield owners and users to establish the possible impacts to take-o/, approach and circuit procedures, including the prediction of potential aircraft heights and safety margins when overflying the OHL, as well as any possible risks of collision with the OHL as a result of engine failure and an emergency landing.
At CAA certified and licensed airfields, specified height constraints apply to the siting of buildings and other nearby obstacles such as an OHL, based on their distance and location relative to a runway. Similar obstacle constraints are adopted at many military airfields. At all other smaller general aviation airfields and airstrips there are nomandatory constraints for obstacles, although airfield owners and pilots should ensure that all aircraft using an airfield can do so safely with su/icient clearance from obstacles.
To assess the potential impact of an OHL near an unlicensed airfield in detail, ASA has developed a model based on aircraft performance (e.g. rate of climb or approach angle), together with an assessment of the safety risks, based on a review of the circumstances of all air accidents in the UK involving collision with an OHL (electrical transmission or telephone line) over the past 10 years. Whilst the likelihood of an accident due to an OHL near airfield is generally very low, it is important that appropriate risk mitigations are in place, such as promoting pilot awareness of an OHL both at the pre-flight planning stage and during flight. Other possible aviation-related risks including any impacts to ballooning, unmanned aerial systems (drones), military and civil radar installations and other ground-based navigation aids are also evaluated.
ASA’s assessment supports National Grid’s commitment to community consultation and engagement and will form part of the formal application for the Development Consent Order (DCO) which is planned to be submitted to the Planning Inspectorate next year.

Join the conversation